talues-front-

Project description

Construction of stabilization, protection and reinforcement of slopes of the DB-Cerro de Mercado and DA-DB railroad interconnection cuts.

Work volumes:
Construction of slope stabilization based on triple twist mesh and post-tensioned self-drilling anchors and reinforced concrete grid in:

  • Cerro del Mercado.
  • Palacios Hill.
  • Villareal Hill.

Location

Durango, Dgo.

Investment

$102 MDP

Download service catalog

An overview of our construction, design, maintenance and supervision services.

CV-Nexumrail.PDF