main

Project description

Construction of railroad tracks on viaducts and embankments, vehicular and railroad bridges and drainage works.


Work volumes:

  • Construction of 5 km of elastic track.
  • 247 m long elevated concrete viaduct with 10 spans.
  • 5 Railway overpasses.
  • 1 Railroad underpass .
  • Drainage works.


Volumes of earthworks:

  • Earthwork: 984,743 M3.
  • Cuts: 209,476 M3.
  • Embankments: 775,267 M3.

 

Location

Celaya, Gto.

Investment

$ MDP

Download service catalog

An overview of our construction, design, maintenance and supervision services.

CV-Nexumrail.PDF