
Project description
Construction of railroad tracks on viaducts and embankments, vehicular and railroad bridges and drainage works.
Work volumes:
- Construction of 5 km of elastic track.
- 247 m long elevated concrete viaduct with 10 spans.
- 5 Railway overpasses.
- 1 Railroad underpass .
- Drainage works.
Volumes of earthworks:
- Earthwork: 984,743 M3.
- Cuts: 209,476 M3.
- Embankments: 775,267 M3.
Location
Celaya, Gto.
Investment
$ MDP
Download service catalog
An overview of our construction, design, maintenance and supervision services.