MAIN

Project description

Description of the work:

Construction of railroad tracks, administrative offices, storage warehouse, roads, medium and low voltage electrification, lighting system, fiber optics, telecommunications system, drainage systems.

Work volumes:

  • Construction of 24 km of classic track
  • Warehouse 1500 m2
  • Office building 752 m2
  • Concrete roads 726 m
  • Perimeter dirt road 6.9 km
  • Telecommunications tower height 80 m

Volumes of earthworks:

  • Earth moving: 791,273 M3
  • Cuts: 222,547 M3
  • Embankments: 568,725 M3

 

Location

Logistics Center Durango, Dgo.

Investment

$ 423 MDP

Download service catalog

An overview of our construction, design, maintenance and supervision services.

CV-Nexumrail.PDF