
Project description
Description of the work:
Construction of railroad tracks, administrative offices, storage warehouse, roads, medium and low voltage electrification, lighting system, fiber optics, telecommunications system, drainage systems.
Work volumes:
- Construction of 24 km of classic track
- Warehouse 1500 m2
- Office building 752 m2
- Concrete roads 726 m
- Perimeter dirt road 6.9 km
- Telecommunications tower height 80 m
Volumes of earthworks:
- Earth moving: 791,273 M3
- Cuts: 222,547 M3
- Embankments: 568,725 M3
Location
Logistics Center Durango, Dgo.
Investment
$ 423 MDP
Download service catalog
An overview of our construction, design, maintenance and supervision services.